Tools supplies tin sn.
Rubber roof drip edge with half inch foam installation.
Applied with metal and standing seam roofing an open hemmed drip edge will deter water from going upward as a result of capillary action and passing the drip edge metal.
Place corner pieces where panels will meet bends at the edge of the roofing.
This is important to protect damage to your fascia soffits rafters.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
Utilized on low incline roofs l shape drip edges are situated on the roof deck and atop the fascia board.
I could also imagine but i have to stop and think about how i would fold it a custom drip edge that protrudes maybe 1 2 or 3 4 beyond the roof but turns a 90 deg.
Run vertical 2 3 boards battens over roof sheething 16 o c.
If the rubber is stretched this puts a built in stress on the seam finally roll the seam with a hand roller to get 100 adhesion then apply a bead of a special lap caulk to the edge of the seam to keep water from getting between the layers.
Drops maybe an inch as a vertical return and then folds 180 running back up and returning to the roof edge under the horizontal and finally drops the.
Corner instead of 180.
How to install a drip edge.
Seam tape is a very sticky two sided tape that comes in a 6 inch roll with a release paper on one side.
With without rain gutters.
Make sure the outer edge extends over the gutter.
This will create ventilation and separation between attic roof substate and the roof itself.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Around the perimeter of a roof that is not a run off point for water drip you will need to keep the water on the roof and drive it towards your drip trim.
Secure the drip edge with roofing cement.
This is done with kerb edge trims these not only keep the water on the roof thanks to a built in up stand but also cloak the fascia to make the finish look smart from the floor.
And then install 1 2 minimum recommended is 5 8 or thicker plywood on top of battens.
If it doesn t pull the drip edge out slightly from under the shingles.